September
21, 2006 - Here
Caleb Keneipp, Brooke Lucas, and Ron Perrone set up and spike down the
timber foundation.

September
25, 2006

September
27, 2006 - Tonry
Lathroum,
Ron, Wendy (taking the picture), Caleb, and Carole Jackson start the
hallway walls and roof.

October
10, 2006 - Now
the walls of
the 3 inner rooms go up.

October
18, 2006 - Volunteers
from Concord University pitch in.

October
26, 2006 - A
view of the long inner room on the left, and the 2 smaller
rooms separated by the hallway on the right.

November
1, 2006 - Here
Ron and Caleb
add 2 extra feet to bring the exterior walls of the three inner cages
up to 12 feet.

As of November 11, 2006 - This is the view from a nearby
tree (photo courtesy of
Caleb). The inner dividing walls will rise another 4 feet (to 14 feet)
and provide the pitch of the roof.

December 3, 2006 - Here Andy Woodruff and Ron are laying out the
rafters.

December 12, 2006 - Andy and Ron atop the roof, which is ready for the
transluscent panels.

January 3, 2007 - half of the Tuftex roof panels were on.,
covering the long cage #3.

Below, Alisha Morey's family slammed up more plywood
and
hung the door to the largest cage. Left to right; Nyoka, Nathan, Lou,
and Robert.


January 11, 2007 - A female Peregrine falcon was released into the
largest of the three cages, cage #3 for flight conditioning prior to
release.